Understanding confined pillar performance under high stress

Pillar behaviour needed to be understood and validated under a high-stress mining sequence. The challenge was to assess how confined pillars performed, how damage developed, and what stress conditions should inform future pillar design and extraction planning.
JM Geomechanics used modelling, back analysis and available core drilling/logging observations to compare predicted pillar damage with observed performance. The work helped validate the stress levels associated with different stages of rock mass damage.
Talk to JM Geomechanics about technical support, operational geotechnical input, modelling, investigation or training for your site.